Most homes get wired without a plan.
The crew works it out on site, and whatever they miss turns up after the drywall. Fixing it costs more than drawing it first.
What you get
-
DS
Drop Schedule
Where every data, coax, and speaker drop goes, room by room, with cable type and count.
-
FP
Floor Plan Markups
Your own plans, marked with every drop and dimensioned off door openings and wall corners.
-
CP
Conduit and Pathway Plan
Sleeves, stub-ups, chases, and the runs that have to happen before drywall.
-
RE
Rack Elevation and Equipment Spec
Where the equipment goes, what it is, how much rack space it needs, and what it takes to power and cool it.
We draw the first three together. The rack elevation is an add-on.
Drop Schedule — extract
| Tag | Room | Location | Cable | Qty | Height |
|---|---|---|---|---|---|
| D1 | Great room | TV wall, left of fireplace | Cat6A | 2 | 62″ AFF |
| D1 | Great room | TV wall, left of fireplace | RG6 | 1 | 62″ AFF |
| S1 | Great room | Ceiling, front left and right | 14-2 SP | 2 | Ceiling |
| D2 | Great room | West wall, seating | Cat6A | 2 | 18″ AFF |
| D3 | Study | North wall, desk | Cat6A | 4 | 18″ AFF |
| D4 | Study | East wall, camera | Cat6A | 1 | 96″ AFF |
| D9 | Mechanical | Rack position | Cat6A | 2 | 84″ AFF |
| X1 | Exterior | Front soffit, northeast | Cat6A | 1 | Soffit |
| X2 | Exterior | Driveway gate | Cat6A | 1 | 24″ AFF |
Your installer can pull from it without calling, and your general contractor can check the work before the walls close.
How it works
-
Send your floor plans and elevations, PDF or DWG. Add the electrical plan if you have one.
-
You get a first draft on a date we set when the job starts, as a PDF sized to your plan set. Tell us what to change and we revise it once at no extra cost.
-
Hand the set to your trades and they build from it. We print and ship hardcopies at cost.
Pricing
Flat fee, set by the size of the house. We don’t bill hourly.
- Up to 3,000 sq ft $1,250
- 3,000 to 5,000 sq ft $2,000
- 5,000 to 8,000 sq ft $2,750
- Over 8,000 sq ft Quoted
Conditioned floor area. Every plan includes all three sheets, one round of revisions, and room reserved for the rack with power and ventilation to match.
- Rack elevation and equipment spec $450
- We spec the actual equipment against the room the plan reserves.
- Coordination $750
- We come out to the site, and you get a second round of revisions. Included within 25 miles of Kingston.
Send your plans and get back a set the trades can build from.